Add to Cart
Batch Type Asphalt Recycling Plant Asphalt Regenerating Station
Product Description
Features
- The RAP aggregate adding rate can reach 30% to 60%.
- Blade design of drying drum is reasonable, high heat exchange efficiency, easy to replace.
- Asphalt flue gas after the cyclone dust collector is introduced to drying drum of asphalt mixing plant for secondary combustion; reduce the pollution of asphalt flue gas.
- The whole system is in a full closed, no leakage, to achieve environmental effects.
- RAP conveyor belt with high temperature material to ensure long working life.
- Can adjust the amount of air, control the exhaust temperature, improve the regeneration drum thermal efficiency.
- And the main asphalt mixing plant online interaction, to achieve two systems automatically coordinate the work.
- Any parts of the failure, the two systems can achieve downtime and alarm
Specification of RAP Asphalt Recycling Plant
Model | RAP60 | RAP80 | RAP120 | RAP160 | |
Rated Capacity | 60T/H | 80T/H | 120T/H | 160T/H | |
RAP Aggregate Kinds | 2 | 2 | 3 | 3 | |
RAP Cold Aggregate Supply System | Aggregate Bin | 10m3 x 2 | 12m3 x 2 | 12m3 x 3 | 15m3 x 3 |
Feeder | Width: 500mm | Width: 500mm | Width: 650mm | Width: 650mm | |
Belt Conveyor | Width: 650mm | Width: 650mm | Width: 650mm | Width: 650mm | |
Cold Aggregate Elevator | 11kw | 11kw | 15kw | 15kw | |
Drying Drum | Drum Diameter | 1600mm | 1800mm | 2200mm | 2600mm |
Power | 4 x 7.5kw | 4 x 11kw | 4 x 18.5kw | 4 x 22kw | |
Burner | Oil Consumption | 450kg/h | 550kg/h | 950kg/h | 1200kg/h |
RAP Temporary Storage Bin | 4m3 | 5m3 | 8m3 | 10m3 | |
RAP Aggregate Weighing | 800kg x 3 | 1000kg x 3 | 1500kg x 3 | 2000kg x 3 | |
RAP Conveyor Belt | 11kw | 11kw | 15kw | 15kw | |
Dust Collecting System | Exhaust Fan | 30kw | 37kw | 45kw | 55kw |
Control System | PLC Auto/Manual | PLC Auto/Manual | PLC Auto/Manual | PLC Auto/Manual | |
Total Power | 144kw | 165kw | 222kw | 268kw |